All Issue

2017 Vol.26, Issue 1 Preview Page
31 January 2017. pp. 27-34
Abstract
References
1
Choi, M. K., S. W. Yun, H. N. Kim, S. Y. Lee, C. Yu, and Y. C. Yoon. 2015. Uplift capacity of pipe foundation for singlespan greenhouse. Protected Horticulture and Plant Factory 24(2):69-78 (in Korean).
10.12791/KSBEC.2015.24.2.069
2
Kim, C. G. 2014. Agriculture policy for reclaimed land. Journal Society of Agri. Research on Reclaimed Lands 12:1-7 (in Korean).
3
Korea Geotechnical Society (KGS). 2009. Foundation design code (in Korean).
4
Korea Meteorological Administration (KMA). 2016. http://www.kma.go.kr.
5
Ministry of Agriculture, Food and Rural Affairs (MAFRA), Rural Development Administration (RDA). 2014. The drawings and detailed statements of anti-disaster specifications for horticultural and special-crops facilities. (in Korean).
6
Ministry of Agriculture, Food and Rural Affairs (MAFRA). 2015. Greenhouse status for the vegetable grown in facilities and the vegetable productions in 2014. MAFRA, Sejong, Korea (in Korean).
7
Rural Development Administration (RDA). 2007a. Guidebook for reducing of meteorological disasters of agricultural facilities. RDA, Suwon, Korea (in Korean).
8
Rural Development Administration (RDA). 2007b. Symposium for reducing of meteorological disasters of agricultural facilities. RDA, Suwon, Korea (in Korean).
9
Rural Development Administration (RDA). 2009. The workshop for reduction countermeasure of meteorological disasters for horticultural and special facilities. RDA, Suwon, Korea (in Korean).
10
Yu, I. H., Y. G. Ku, M. H. Cho, H. R. Ryu, and D. G. Moon. 2014. An analysis of problems and countermeasures in the installation of plastic greenhouse on reclaimed lands. CNU Journal of Agricultural Science 41(4):473-480 (in Korean).
10.7744/cnujas.2014.41.4.473
Information
  • Publisher :The Korean Society for Bio-Environment Control
  • Publisher(Ko) :(사)한국생물환경조절학회
  • Journal Title :Protected Horticulture and Plant Factory
  • Journal Title(Ko) :시설원예ㆍ식물공장
  • Volume : 26
  • No :1
  • Pages :27-34
  • Received Date : 2016-10-24
  • Revised Date : 2016-12-27
  • Accepted Date : 2017-01-04